Anern AN-SCI-EVO OEM series (SMS 2 kVA/12 V, 4.2 kW/24 V, 10.2 kVA/48 V hybrid units)

SMS Sunmate Solar 07 error code

Overload timeout: the inverter has been loaded above 110% of its rating and the overload timer has expired, so the output is switched off.

Likely causes

  • Connected load above the inverter rating
  • High inrush current from motors, pumps, fridges or air conditioners
  • Several large loads starting at the same time
  • Inverter undersized for the installation

Checks to run, in order

  1. 1Total the nameplate watts of everything on the output
  2. 2Clamp-meter the output current with the normal load running
  3. 3Switch all loads off, restart, then add loads one at a time and watch the display
  4. 4Check for a partial short that is presenting as overload

Fixes

  • Reduce the connected load by switching off non-essential appliances
  • Stagger the start-up of motor and compressor loads
  • Move the largest loads to another source or fit a larger inverter

When to escalate

If code 07 trips at less than half the rated load, the current sensing or output stage is faulty and the distributor should bench-test the unit.

Fix it with the right tools

Check the system around the fault before replacing parts: load, battery bank, PV string and commissioning settings. If you need a second opinion, send the code and your inverter model to our team.

Before you open the inverter

  • Isolate both the AC and DC sides, then confirm the display is dead before touching terminals.
  • Use insulated tools and one hand where possible. DC arcs do not self-extinguish like AC.
  • If you see burnt terminals, swollen cells, leaking electrolyte or a burning smell, stop and escalate instead of resetting the fault.

Questions installers ask

What does SMS Sunmate Solar 07 mean?

Overload timeout: the inverter has been loaded above 110% of its rating and the overload timer has expired, so the output is switched off.

How do I fix SMS Sunmate Solar 07?

Reduce the connected load by switching off non-essential appliances Stagger the start-up of motor and compressor loads Move the largest loads to another source or fit a larger inverter

When should I escalate SMS Sunmate Solar 07?

If code 07 trips at less than half the rated load, the current sensing or output stage is faulty and the distributor should bench-test the unit.

Can I reset SMS Sunmate Solar 07 myself?

Only after isolating the AC and DC sides and running the checks above. If SMS Sunmate Solar 07 returns immediately, stop resetting it and escalate; a repeating fault usually points to a real circuit, battery or hardware problem.

Which models show SMS Sunmate Solar 07?

SMS Sunmate Solar 07 is documented for Anern AN-SCI-EVO OEM series (SMS 2 kVA/12 V, 4.2 kW/24 V, 10.2 kVA/48 V hybrid units). Confirm the code on your own unit's display or manual before ordering parts.